Incoprea Theory
Vol. XXIV · 219

Theory 209/Power outages/Threshold lens

Cascades Need a Margin Threshold

The claim

Cascading failure occurs only where reserve margin falls below a threshold, so a well-margined grid absorbs the same fault.

01Mechanism

Overload requires the redistributed flow to exceed capacity somewhere; the threshold determines whether any element is vulnerable.

02Prediction

Cascades should track minimum margin.

03Refutation

Cascades tracking fault size would remove margin.